UPVC MEDIUM DUTY SOLVENT CEMENT
- Clear, medium duty, uPVC cement for all classes & schedules of pipes & fittings with interference fit through 8“ (200 mm) diameter
- To be used for uPVC pipes transporting low pressure potable water, drainage & PVC foam core pipes
- Meets IS:14182 and ASTM D-2564 Standard
Size (ml) | IM Code | Inner Pack Qty. | Master Pack Qty. |
---|---|---|---|
50 ml | IM10067265 | 24 | 288 |
100 ml | IM10067266 | 12 | 144 |
250 ml | IM10067267 | 12 | 72 |
500 ml | IM10067268 | 6 | 36 |
1000 ml | IM10067269 | 4 | 16 |
UPVC HEAVY DUTY SOLVENT CEMENT
- Clear, heavy duty, uPVC cement for all classes & schedules of pipes & fittings with interference fit through 16” (400 mm) diameter
- To be used for plumbing, industrial, irrigation & electrical conduit pipes
- Meets IS:14182 and ASTM D-2564 Standard
Size (ml) | IM Code | Inner Pack Qty. | Master Pack Qty. |
---|---|---|---|
50 ml | IM10067260 | 25 | 288 |
100 ml | IM10067261 | 12 | 144 |
250 ml | IM10067262 | 24 | 72 |
500 ml | IM10067263 | 24 | 36 |
1000 ml | IM10067264 | 12 | 16 |
Electrical Conduit Application
UPVC / PVC Pipes & fittings & drainage System
UPVC / PVC pipe assemblies for industrial
CPVC Pipes & fittings for pressurized
Average Initial Set Time for Infra.Market - PVC / UPVC / CPVC SOLVENT CEMENT | |||||
TEMPERATURE RANGE | PIPE SIZE 15 mm to 40 mm | PIPE SIZE 50 mm to 63 mm | PIPE SIZE 75 mm to 200 mm | PIPE SIZE 250 mm to 315 mm | PIPE SIZE 355 mm & above |
---|---|---|---|---|---|
16°-50° C | 2 minutes | 5 minutes | 30 minutes | 2 hours | 4 hours |
5°-16° C | 5 minutes | 10 minutes | 2 minutes | 8 hours | 16 hours |
(-18°)-5° C | 10 minutes | 15 minutes | 12 minutes | 24 hours | 48 hours |
Average Initial Curing Time for Infra.Market - PVC / UPVC / CPVC SOLVENT CEMENT | ||||||||
TEMPERATURE RANGE | PIPE SIZE 15 mm to 40 mm | PIPE SIZE 50 mm to 63 mm | PIPE SIZE 75 mm to 200 mm | PIPE SIZE 250 mm to 315 mm | PIPE SIZE 355 mm & above | |||
---|---|---|---|---|---|---|---|---|
Upto11 kgf / cm² | 11 to 26kgf / cm² | Upto11 kgf / cm² | 11 to 22kgf / cm² | Upto11 kgf / cm² | 11 to 22kgf / cm² | Upto7 kgf / cm² | Upto7 kgf / cm² | |
16°-50° C | 15 minutes | 6 hours | 30 minutes | 12 hours | 1.5 hours | 24 hours | 48 hours | 72 hours |
5°-16° C | 20 minutes | 12 hours | 45 minutes | 24 hours | 4 hours | 48 hours | 96 hours | 6 days |
(-18°)-5° C | 30 minutes | 48 hours | 1 hours | 96 hours | 72 hours | 8 days | 8 days | 14 days |
Average Number of Joints per Litre of Infra.Market - PVC / UPVC / CPVC SOLVENT CEMENT | |||||||||||||||||
Pipe Diameter | 20 mm | 25 mm | 32 mm | 40 mm | 50 mm | 63 mm | 75 mm | 90 mm | 110 mm | 140 mm | 160 mm | 180 mm | 225 mm | 250 mm | 315 mm | 400 mm | |
No. of Joints | 350 | 300 | 250 | 200 | 150 | 125 | 103 | 79 | 54 | 36 | 27 | 23 | 12 | 7 | 5 | 3-4 |